Projects & References
A selection of electromechanical projects carried out in institutional and industrial buildings.
Infrastructure & Tunnels
1915 Çanakkale Bridge
Client
Siemens
Scope
Electrical & Mechanical
Duration
2022
The electrical and mechanical installation works for the 1915 Çanakkale Bridge were carried out by our company. On this structure spanning the Dardanelles Strait — the world's longest mid-span suspension bridge — fire suppression lines, mechanical installation and electrical infrastructure applications were completed with precision.
View Details →
AVM & Retail
Symbol Shopping and Living Center
Client
Kavanlar
Scope
Electrical & Mechanical
Year
2026
The electrical and mechanical installation works at the Symbol Shopping and Living Center — the largest mixed-use project in the Eastern Marmara region — were carried out by our company. In the mall section of the 185,000 m² complex, which combines a shopping center, hospital, hotel and congress center, central HVAC, ventilation, fire suppression, plumbing and electrical infrastructure systems were implemented in compliance with standards.
View Details →
Health Facilities
Seyrantepe Hamidiye Etfal Training and Research Hospital
Client
Genç İnşaat
Scope
Electrical & Mechanical
Duration
2021
The electrical and mechanical installation works at the Seyrantepe Hamidiye Etfal Training and Research Hospital, one of Istanbul's largest city hospitals, were carried out by our company. On this vast campus with 176,595 m² of indoor area, 702 beds and 24 operating rooms, hygienic ventilation, HVAC, plumbing, fire suppression and electrical infrastructure systems dedicated to operating room and intensive care areas were implemented in compliance with hospital standards and fully commissioned.
View Details →
Health Facilities
Florya Medicalpark Hospital
Client
MLP Health Services Inc.
Scope
Mechanical
Duration
2017
The motorized valve and thermostat applications at the Florya Medicalpark Hospital were carried out by our company. The automatic control and regulation equipment of the mechanical systems were commissioned in compliance with standards.
View Details →
Infrastructure & Tunnels
Eğribel Tunnel
Client
Siemens
Scope
Mech
Duration
2023
The water-based fire suppression system at the Eğribel Tunnel — located on the 2,200 m altitude Eğribel Pass and among Türkiye's longest tunnels — was carried out by our company. The fire suppression lines, critical for tunnel safety, were implemented and commissioned across both tubes in compliance with standards.
View Details →
Educational Facilities
Istanbul Aydın University Block T Social Sciences Campus
Client
Istanbul Aydın University
Scope
Electrical & Mechanical
Duration
2021
The electrical and mechanical installation works at Block T Social Sciences Campus — a campus in its own right located at Istanbul Aydın University's Florya Halit Aydın Campus — were carried out by our company. In this multi-storey campus of 70,000 m² indoor area, comprising classrooms, a library, conference halls, a museum, sports halls, a cafeteria and car park, HVAC, plumbing, fan-coil, dehumidification, fire suppression and electrical infrastructure systems were implemented in compliance with standards and fully commissioned.
View Details →
Hotel & Tourism
Curio by Hilton Yeşil Ev (Hagia Sofia Mansions)
Client
Dorak Holding
Scope
Electrical & Mechanical
Duration
2019
The electrical and mechanical installation works at the historic Curio by Hilton Yeşil Ev hotel in Sultanahmet were carried out by our company. In this 78-room structure with a historic fabric, comfort-oriented HVAC, plumbing and electrical systems were implemented with precision in keeping with the building's original character.
View Details →
Infrastructure & Tunnels
Yağdonduran Tunnel
Client
Siemens
Scope
Mech
Duration
2023
The water-based fire suppression systems at the tunnel built on the 1,750 m altitude Yağdonduran Pass on the Sivas-Malatya highway were carried out by our company. In this tunnel — the first in Türkiye to feature a remotely controlled fire suppression system — the advanced fire safety infrastructure was commissioned in compliance with standards.
View Details →
Industrial Facilities
Bosch (BSH) Çerkezköy Factory Building
Client
Bosch
Scope
Electrical & Mechanical
Year
2013
The electrical and mechanical installation works at the Bosch (BSH) Çerkezköy factory facility — Europe's largest white goods production and R&D base — were carried out by our company. In this high-capacity industrial facility, industrial ventilation, process mechanical installation, HVAC and electrical infrastructure systems were implemented in compliance with international standards and fully commissioned.
View Details →
ING Bank Operations Center
Client
ING Bank
Scope
Electrical & Mechanical
Year
2026
All electrical and mechanical infrastructure systems required for the large-scale office areas of the ING Bank Operations Center were designed and implemented by our company. Smart building systems focusing on data security, high energy efficiency, and staff comfort were integrated.
View Details →
Hotel & Tourism
Carus Cappadocia Hotel
Client
BMM Group
Scope
Electrical & Mechanical
Year
2026
The electrical and mechanical installation works at the Carus Cappadocia Hotel were carried out by our company. In this boutique hotel comprising stone and cave rooms, automation, pool mechanical systems, HVAC and electrical infrastructure were implemented in keeping with the building's unique fabric.
View Details →
Industrial Facilities
DowAksa Factory Building (Water-based Fire Suppression)
Client
Siemens (Siemens Building Technologies)
Scope
Industrial facility — water-based fire suppression system
Duration
2023
The water-based fire suppression system at the DowAksa carbon-fiber production facility was carried out by our company. The fire protection infrastructure, critical for industrial facility safety, was implemented in compliance with standards and commissioned.
View Details →
Health Facilities
Acıbadem Kent Hospital
Client
Acıbadem Group
Scope
Electrical & Mechanical
Duration
2004
Complex electrical and mechanical system updates required within the scope of Kent Hospital's renovation works were conducted by our company under the contractorship of Haskale Mimarlık. Medical infrastructure, hygienic ventilation, and uninterruptible power systems compliant with hospital standards were modernized and commissioned.
View Details →
Sports Facilities
Erzurum Curling Hall
Client
Tümsan A.Ş.
Scope
Electrical & Mechanical
Year
2026
The electrical and mechanical installation works at the Erzurum Curling Hall were carried out by our company. Precision cooling and climate control systems specific to the curling ice surface were implemented in compliance with standards and commissioned.
View Details →
Sports Facilities
TOFAŞ Sports Hall
Client
Tümsan A.Ş.
Scope
Mechanical Installation
Duration
2014
The mechanical installation works at the 7,500-capacity TOFAŞ (Nilüfer) Sports Hall were carried out by our company. Ventilation, heating and cooling systems dedicated to the high-capacity hall were implemented in compliance with standards and fully commissioned.
View Details →
Industrial Facilities
Landfill Gas to Electricity Plant (Şile)
Client
Ortadoğu Enerji
Scope
Electrical & Mechanical
Year
2026
The electrical and mechanical works at the Şile Landfill Gas to Electricity Plant were carried out by our company. Mechanical and electrical infrastructure applications specific to the waste-to-energy facility were completed.
View Details →
Health Facilities
Pendik Medicalpark Hospital
Client
MLP Health Services Inc.
Scope
Mechanical Installation
Duration
2018
The mechanical installation and revision works at the Pendik Medicalpark Hospital were carried out by our company. Heating, cooling and ventilation systems compliant with hospital comfort and hygiene requirements were implemented and fully commissioned.
View Details →
AVM & Retail
Housing & Office
262 Towers (Office-Residence-Mall Complex)
Client
Bambau Real Estate (Regan/Rekan İnşaat)
Scope
Mechanical Installation
Year
2026
The mechanical installation works at the 262 Towers mixed-use complex, rising opposite the Symbol Living Center in İzmit, were carried out by our company. In this 68,600 m² construction-area project — comprising 14-storey, 3 blocks with office, residence and retail units, plus a swimming pool, SPA, sports hall, conference and cinema halls — central heating-cooling (HVAC), plumbing and ventilation systems were implemented in compliance with standards.
View Details →
Hotel & Tourism
Hampton by Hilton Kocaeli Symbol Hotel
Client
Kavanlar
Scope
Electrical & Mechanical
Year
2026
The electrical and mechanical installation works at the 207-room Hampton by Hilton Kocaeli Symbol Hotel, located within the Symbol Shopping and Living Center, were carried out by our company. HVAC, plumbing, hot water and electrical infrastructure systems compliant with hotel comfort standards were fully implemented and commissioned.
View Details →
Industrial Facilities
Landfill Gas to Electricity Plant
Client
Ortadoğu Enerji
Scope
Electrical & Mechanical
Year
2026
The electrical and mechanical works at the Kemerburgaz Landfill Gas to Electricity Plant were carried out by our company. Mechanical process installation and electrical infrastructure applications specific to the waste-to-energy facility were completed.
View Details →
Sports Facilities
Erzurum Ice Rink
Client
Tümsan A.Ş.
Scope
Electrical & Mechanical
Year
2026
The electrical and mechanical installation works at the Erzurum Ice Rink were carried out by our company. Cooling, humidity control and electrical infrastructure systems specific to the ice rink were implemented in compliance with standards.
View Details →
Hotel & Tourism
Ongoing
Avrasya Hotel
Client
Urlu Health Services Inc.
Scope
Electrical & Mechanical
Year
2026
The electrical and mechanical installation works for the Avrasya Hotel project were carried out by our company. HVAC, plumbing and electrical infrastructure systems compliant with hotel comfort standards were implemented and fully commissioned.
View Details →
Sports Facilities
Silivrikapı Full Olympic Ice Rink
Client
Tümsan-Frigo Joint Venture
Scope
Electrical & Mechanical
Year
2026
The electrical and mechanical installation works at the Silivrikapı Full Olympic Ice Rink were carried out by our company. Cooling, humidity control, ventilation and electrical infrastructure systems specific to the ice rink were implemented in compliance with standards and commissioned.
View Details →
Housing & Office
Rota Office
Client
Tümsan A.Ş.
Scope
Electrical & Mechanical
Year
2026
The electrical and mechanical installation works for the Rota Office project — comprising two blocks in Halkalı Atakent — were carried out by our company. In this structure of office and retail units, HVAC, plumbing, ventilation and electrical infrastructure systems were implemented in compliance with standards and fully commissioned.
View Details →
Health Facilities
Konak Hospital — Electromechanical Installation Works
Scope
Electrical & Mechanical
Year
2026
The electrical and mechanical infrastructure works of Konak Hospital, one of the region's significant healthcare investments, were carried out by our company. Sensitive HVAC, operating room hygienic ventilation systems, medical gas infrastructure, and electrical panels providing uninterruptible power, which are strictly required by healthcare facilities, were successfully commissioned in accordance with international healthcare standards.
View Details →
Housing & Office
Skyland Istanbul Office Tower — Bespoke Office Fit-out
Client
Confidential Client
Scope
Electrical & Mechanical
Year
2026
At the Skyland Istanbul Office Tower — one of Istanbul's tallest structures — the electrical and mechanical installation works of a bespoke office fit-out for a private client were carried out by our company. HVAC, plumbing and electrical infrastructure systems tailored to the high-rise office environment were implemented with precision in line with client requirements and building standards, and fully commissioned.
View Details →
Housing & Office
SBN Insurance Building — Electrical Works
Client
Ermet İnşaat
Scope
Electrical
Year
2026
Comprehensive electrical infrastructure and installation works of the SBN Insurance Building were carried out by our company under the main contractor Ermet İnşaat. Weak current, lighting, and power systems required by modern office buildings were successfully completed in accordance with the project.
View Details →
Housing & Office
Tekfen Tower Deutsche Bank — Office Fit-out
Client
Deutsche Bank
Scope
Electrical & Mechanical
Year
2026
The electrical and mechanical installation works for the Deutsche Bank office located in Tekfen Tower, one of Istanbul's prestigious business centers, were carried out by our company. Infrastructure systems complying with international banking standards and high-security requirements were fully installed and commissioned.
View Details →
Educational Facilities
Yıldız Technical University Technopark Workshop Building
Client
YTÜ Technopark
Scope
Electrical & Mechanical
Year
2026
The electrical and mechanical installation works at the Yıldız Technical University Technopark Workshop Building were carried out by our company. Ventilation, HVAC, plumbing and electrical infrastructure systems suited to R&D and production workshops were implemented in compliance with standards.
View Details →
Health Facilities
Kanuni Training and Research Hospital
Client
Genç İnşaat
Scope
Electrical & Mechanical
Duration
2012
The electrical and mechanical installation works at Kanuni Training and Research Hospital, one of the most important healthcare institutions in the Black Sea Region, were carried out by our company. In this high-capacity, multi-disciplinary training and research hospital, hygienic ventilation, HVAC, plumbing and electrical infrastructure systems dedicated to operating room and intensive care areas were implemented in compliance with hospital standards and fully commissioned.
View Details →
Health Facilities
Istanbul Aydın University (İAÜ) Dentaydın Esenyurt Integrated Clinic
Client
Istanbul Aydın University
Scope
Electrical & Mechanical
Duration
2020
The electrical and mechanical installation works at the Istanbul Aydın University Dentaydın Esenyurt Integrated Clinic were carried out by our company. Hygienic ventilation, compressed air, plumbing and electrical infrastructure systems dedicated to dental clinic, laboratory and treatment areas were implemented in compliance with hospital standards and fully commissioned.
View Details →
Infrastructure & Tunnels
Badal Tunnel
Client
Siemens
Scope
Electrical & Mechanical
Duration
2023
The electrical and mechanical works at the Badal Tunnel on the Osmancık-Merzifon road were carried out by our company. In the twin-tube tunnel, lighting, ventilation (jet fan), fire safety and electromechanical systems were implemented in compliance with standards.
View Details →
Health Facilities
Educational Facilities
İstinye University Hospital
Client
İstinye Uni.
Scope
Mechanical Installation
Duration
2016
The mechanical installation works at the İstinye University Health Application and Research Center were carried out by our company. Main mechanical works, additional fabrication, air curtain, boiler pump, gas room and pipe replacement works, along with OHS inspection, were fully implemented in compliance with hospital standards.
View Details →
Health Facilities
Ulus Liv Hospital
Client
MLP Health Services Inc.
Scope
Mechanical (HVAC)
Duration
2012
The air conditioning and climate control works at Ulus Liv Hospital were carried out by our company. Cooling and ventilation systems were implemented in compliance with hospital standards.
View Details →
Health Facilities
Private Konak Hospital
Client
Konak Hospital
Scope
Electrical & Mechanical
Duration
2006
The electrical and mechanical installation works at the Private Konak Hospital, one of Kocaeli's established private healthcare institutions, were carried out by our company. In the 9,500 m² indoor facility, hygienic ventilation, HVAC, plumbing and electrical infrastructure systems dedicated to operating room, intensive care and delivery room areas were implemented in compliance with hospital standards and fully commissioned.
View Details →
Health Facilities
Private Ereğli Anadolu Hospital
Client
Anadolu Group
Scope
Electrical & Mechanical
Duration
1991
The electrical and mechanical installation works at the Private Ereğli Anadolu Hospital, one of Karadeniz Ereğli's established private healthcare institutions, were carried out by our company. In the 9,000 m² indoor facility, hygienic ventilation, HVAC, plumbing and electrical infrastructure systems dedicated to operating room, intensive care and delivery areas were implemented in compliance with hospital standards and fully commissioned.
View Details →
Health Facilities
Bursa Medicalpark – LINAC Surroundings Mechanical and Structural Works
Client
MLP Health Services Inc.
Scope
Mechanical & Structural
Duration
2016
The mechanical and structural works around the LINAC (radiotherapy device) at the Bursa Medicalpark Hospital were carried out by our company. Precision installation and structural applications specific to radiotherapy areas were completed in compliance with standards.
View Details →
Health Facilities
Medical Park Yıldızlı Hospital
Client
MLP Health Services Inc. (Medical Park)
Scope
Mechanical (Heating-Cooling Centers Renewal)
Duration
2009
The renewal of the heating and cooling centers at Medical Park Yıldızlı Hospital was carried out by our company. In the 12,000 m² indoor facility, the boiler room, chimney additional fabrication and mechanical system renewal works were completed to improve efficiency and continuity, in compliance with hospital standards.
View Details →
Health Facilities
Avrasya Hospital (Gaziosmanpaşa)
Client
Urlu Health Services Inc.
Scope
Electrical & Mechanical
Duration
2016
The electrical and mechanical installation works at the Gaziosmanpaşa Avrasya Hospital were carried out by our company. HVAC, plumbing and electrical infrastructure systems were implemented throughout the hospital in compliance with standards.
View Details →
Health Facilities
Göztepe Medicalpark Hospital
Client
MLP Health Services Inc
Scope
Mechanical Installation
Duration
2008
Chiller, air conditioning and HVAC pump works at the Göztepe Medicalpark Hospital were carried out by our company. Installation and commissioning of cooling and climate control systems were completed in compliance with hospital standards.
View Details →
Infrastructure & Tunnels
Çakraz Tunnel
Client
Siemens Mobility
Scope
Electrical & Mechanical
Duration
2021
The mechanical works, electrical supply and depot mechanical works at the Çakraz Tunnel on the Bartın-Amasra-Kurucaşile-Cide road were carried out by our company. Electromechanical systems were implemented across the twin-tube tunnel in compliance with standards.
View Details →
Ordu Tunnels Supervision Service
Client
Haskale
Scope
Supervision / Consultancy
Year
2026
Supervision and inspection services for the electromechanical works of the Ordu Tunnels project were provided by our company.
View Details →
Health Facilities
VM Medical Park Kocaeli Hospital
Client
Kavanlar
Scope
Electrical & Mechanical
Duration
2015
The electrical and mechanical installation works at VM Medical Park Kocaeli Hospital, one of the largest private hospitals in Kocaeli, were carried out by our company. In the 48,000 m² indoor facility located within the Symbol Shopping and Living Center, hygienic ventilation, HVAC, plumbing and electrical infrastructure systems dedicated to operating room and polyclinic areas were implemented in compliance with hospital standards and fully commissioned.
View Details →
Health Facilities
Avrasya Hospital (Zeytinburnu)
Client
Urlu Health Services Inc.
Scope
Electrical & Mechanical
Duration
1999
The electrical and mechanical installation works at the Zeytinburnu Avrasya Hospital were carried out by our company. HVAC, plumbing and electrical infrastructure systems were implemented throughout the hospital in compliance with standards.
View Details →
Health Facilities
Fatih Medicalpark Hospital
Client
Urlu Health Services Inc.
Scope
Electrical & Mechanical
Duration
1999
The mechanical installation works at the Fatih Medicalpark Hospital were carried out by our company. Heating, cooling and ventilation systems compliant with hospital standards were implemented.
View Details →
AVM & Retail
Baumax Building Market
Client
Kavanlar
Scope
Electrical & Mechanical
Year
2026
The electrical and mechanical installation works for the Baumax Building Market project were carried out by our company. Ventilation, HVAC, lighting and electrical infrastructure systems suited to the large retail area were implemented in compliance with standards.
View Details →
AVM & Retail
Cache Cafe Electrical Works
Client
Cache
Scope
Electrical
Year
2026
The electrical installation works at Cache Cafe were carried out by our company. Lighting, power and electrical infrastructure systems specific to the venue were implemented in compliance with standards and commissioned.
View Details →
AVM & Retail
Kozyatağı Optimum Mall — MediaMarkt Store
Client
MediaMarkt
Scope
Electrical & Mechanical
Year
2026
The electromechanical infrastructure works of the MediaMarkt store located in Kozyatağı Optimum Mall were carried out by our company. Bespoke solutions tailored to the intensive energy and lighting needs of technology retail were implemented, and the store was fully delivered for customer use.
View Details →
AVM & Retail
Güneşli 212 Mall — MediaMarkt Store
Client
MediaMarkt
Scope
Electrical & Mechanical
Year
2026
All electrical and mechanical installation processes of the MediaMarkt store located in Güneşli 212 Mall were conducted by our company. Ventilation, fire safety, and energy distribution systems were successfully integrated in line with corporate retail standards.
View Details →
AVM & Retail
trump Tower Mall — MediaMarkt Store
Client
MediaMarkt
Scope
Electrical & Mechanical
Year
2026
The electrical and mechanical fit-out works of the MediaMarkt store operating within Şişli Trump Tower Mall were undertaken by our company. The energy infrastructure and HVAC systems, designed to provide uninterrupted power to the store's dense technological product range, were completed according to standards.
View Details →
AVM & Retail
Ankara Forum Mall MediaMarkt
Client
MediaMarkt
Scope
Electrical & Mechanical
Year
2026
The electromechanical works in the renovation and renewal project of the MediaMarkt store located in Ankara Forum Mall were completed in coordination with Mata Mimarlık. The store's existing infrastructure was modernized in accordance with current retail technologies and energy efficiency standards.
View Details →
AVM & Retail
Kipa Mall — MediaMarkt Store
Client
MediaMarkt
Scope
Electrical & Mechanical
Year
2026
All electrical and mechanical infrastructure works of the MediaMarkt store, which became operational within Kipa Mall, were carried out by our company under the assurance of Surur Mimarlık. The store's HVAC, lighting, and power automation systems were successfully commissioned.
View Details →
AVM & Retail
Pendorya Mall — MediaMarkt Store
Client
MediaMarkt
Scope
Electrical & Mechanical
Year
2026
The comprehensive electromechanical installation setups required for the MediaMarkt store in Pendik Pendorya Mall were undertaken by our company. Infrastructure systems capable of safely meeting the intense energy requirements in the consumer electronics field were integrated in line with the store concept.
View Details →
AVM & Retail
Optimum Mall — MediaMarkt Store
Client
MediaMarkt
Scope
Electrical & Mechanical
Year
2026
The electrical and mechanical contracting works of the MediaMarkt branch located within the scope of the Optimum Mall project were conducted by our company. The entire technical infrastructure of the store, including fire suppression, ventilation, and lighting automations, was delivered flawlessly.
View Details →