Project Scope

Industrial facility — water-based fire suppression system

The water-based fire suppression system at the DowAksa carbon-fiber production facility was carried out by our company. The fire protection infrastructure, critical for industrial facility safety, was implemented in compliance with standards and commissioned.
Project Info
Location Yalova, Türkiye
Size 117,000 m²
Client Siemens (Siemens Building Technologies)
Duration/Date 2023
Status Completed