Yağdonduran Tunnel
Project Scope
Mech
The water-based fire suppression systems at the tunnel built on the 1,750 m altitude Yağdonduran Pass on the Sivas-Malatya highway were carried out by our company. In this tunnel — the first in Türkiye to feature a remotely controlled fire suppression system — the advanced fire safety infrastructure was commissioned in compliance with standards.
Project Info
| Location | Ulaş-Kangal, Sivas, Türkiye |
| Size | 1,567 m (twin tube), 5 km with connection roads |
| Client | Siemens |
| Duration/Date | 2023 |
| Status | Completed |
Project Gallery
1 / 3